Showing posts with label john boos. Show all posts
Showing posts with label john boos. Show all posts

Monday, September 26, 2011

Big Changes and a (Good) Surprise

Happy Monday everyone. The crew put in a full day today to make sure that everything's ready for sheetrock installation to begin tomorrow, and it really shows. Before I walked in the front door today I walked around the side of the house to this beautiful sight.


The first of our two new Pella windows has been installed, and we couldn't be happier with how it looks. The muntins you see in the top half will be stained dark when kitchen trim is stained, so it's not totally complete but it's close. The bathroom one will be installed very soon as well.

And that's not all. Our island has finally arrived! We ordered it six weeks ago and shipping was repeatedly delayed, but I picked it up Saturday, and Chris and I promptly put it in the middle of our gutted kitchen and had a celebratory beer on its walnut top. We absolutely love it, and seeing something finished in our very unfinished kitchen was pretty surreal.


The walnut grain on top is beautiful, and will provide a very practical surface that we can use and abuse. This was something we decided was important when we opted for marble counters rather than granite. They are slightly softer and less durable (but oh-so-beautiful and perfect for a classic kitchen look) so the island should make up for any loss in fuctionality. 


I picked up these cute little saddle stools to go with it. They're very comfy and fit nicely under the petite island. The whole setup is currently in our dining room, which is actually nice since we've cleared out the table and chairs.


The crew also got everything all insulated today to get us ready for drywall. The walls were previously empty between the studs, so we hope insulating these two rooms will help our house be a bit less drafty and a lot more efficient. It's strange how filling in the spaces between the studs creates a slightly wall-like effect. Our interior designer friend warned us that when the drywall goes up the room will suddenly feel a lot smaller, and I can see how that would be the case. 


And now for the surprise. Chris was talking to the contractor this morning who informed us that included in the remodel is installation of a ventilation system, which goes into the basement and vents out the wall. To be honest I'm not entirely sure what it does, other than he told us it will make our dehumidifier, which runs constantly in our basement unnecessary. I like the sound of that!


And I like a good surprise - we've had a couple of plumbing snafus during the project - all of which have been fixed, but they're still stressful as they happen. The first was a leak in our basement ceiling last week, which was apparently the result of a poorly connected pipe (big shock there, right?) that had been shifted when the kitchen was replumbed. The plumber fixed it promptly the next day. Then this weekend I ran the washer and our basement sink backed up. We tried to snake out the line ourselves but couldn't. He fixed it today, and I haven't had a chance to talk to him to get the recap. All in all though, he's our hero and has taken everything in great stride, and we know that moving forward our once condemable plumbing is in great shape.

Chris has repeatedly expressed his urge to kiss the plumber. I haven't warned him yet.

And finally, for all of you who are dying of "did the valve arrive" suspense, rest assured we have two valves, installed and ready for faucet trim. Yay for UPS!


That's it for today. Check in tomorrow to see walls start to go up. Crazy!

Thursday, September 8, 2011

Getting Closer!



Remember all that stuff that I have to buy am so excited to buy for our project? Well today I made a big dent in my shopping list! And it was just as fun as I thought it would be. The lovely sink pictured above was today's biggest purchase, but there were several others as well - in red and crossed out below.

Long story short, all our plumbing fixtures (sinks, faucets, etc.) should arrive on our front porch in approximately 4-7 business days, as well as a few fun accessories. Our island delivery was delayed from September 1 to September 13 (boo!) but hopefully we'll have it assembled and ready to show off this week! 

Kitchen Shopping List:
1. island - I just ordered a walnut butcher block island today!
2. 4 overhead lights
3. 1 pendant light for over the sink
4. sink - farmhouse sink I've been drooling over for the past 2.5 years
5. faucet - to keep the sink company
6. cabinet hardware - knobs and pulls for all the cabinet doors
7. appliances - dual fuel range, microwave, dishwasher, scheduled for delivery in September
8. rugs - 2 2x3 rugs for the backdoor and sink areas, gifted from my parents last Christmas

Half Bathroom Shopping List:
1. sink
2. faucet
3. mirror - purchased from my favorite French boutique this weekend
4. towel hook - also purchased from the French boutique this weekend
5. toilet paper holder
6. vanity light - gifted from my parents 2 Christmases ago (originally intended for the kitchen, but plans change in 2 years!)
7. rug

Upstairs Bathroom Shopping List:
1. 2 wall-mount faucets
2. 2 medicine cabinets - ordered this summer during Restoration Hardware's bathroom sale
3. 2 vanity lights
4. 1 overhead light
5. 2 towel hooks
6. 1 towel rod
7. shower curtain rod - reusing our existing rod and roller hooks
8. toilet paper holder
9. shower curtain
10. bath mat
11. bath and shower faucet
12. window treatment - cafe plantation blind
13. cabinet hardware

As you can see, the kitchen and half bath are getting pretty close! The upstairs bathroom needs some love, so I'll have to get rolling on all those items soon - mostly lighting and hardware.

I keep telling myself that the arrival of all of these items will be a great reward for all the cleaning out we have to do this weekend to get ready for demolition to begin on Monday, but somehow I'm still not feeling all that motivated to pack . . . 

Monday, August 15, 2011

Spending the Savings



It's strange after nearly two and a half years of saving to be spending our kitchen savings, but it has officially begun! I've got quite a list of things to buy that go into the project, and I've begun chunking away at it. And to tell you the truth . . . . it's pretty fun!

Kitchen Shopping List:
1. island - I just ordered a walnut butcher block island today!
2. 4 overhead lights
3. 1 pendant light for over the sink
4. sink - farmhouse sink I've been drooling over for the past 2.5 years
5. faucet - to keep the sink company
6. cabinet hardware - knobs and pulls for all the cabinet doors
7. appliances - dual fuel range, microwave, dishwasher, scheduled for delivery in September
8. rugs - 2 2x3 rugs for the backdoor and sink areas, gifted from my parents last Christmas

Half Bathroom Shopping List:
1. sink
2. faucet
3. mirror - purchased from my favorite French boutique this weekend
4. towel hook - also purchased from the French boutique this weekend
5. toilet paper holder
6. vanity light - gifted from my parents 2 Christmases ago (originally intended for the kitchen, but plans change in 2 years!)
7. rug

Upstairs Bathroom Shopping List:
1. 2 wall-mount faucets
2. 2 medicine cabinets - ordered this summer during Restoration Hardware's bathroom sale
3. 2 vanity lights
4. 1 overhead light
5. 2 towel hooks
6. 1 towel rod
7. shower curtain rod - reusing our existing rod and roller hooks
8. toilet paper holder
9. shower curtain
10. bath mat
11. bath and shower faucet
12. window treatment - cafe plantation blind
13. cabinet hardware

So, we have a good start on our shopping but quite a bit more fun to come in the next few weeks. We met with our prospective cabinet maker today, so should have good numbers on the project in the next few days. Things are moving along, and we couldn't be happier!

twitter test