Monday, October 17, 2011

Charmed by Tile

When I left the house this morning, Our contractor, two tile installers and a stone countertop templater (not a word, but you get the drift) were all there working hard. While we won't see the effects of countertop guy's work for 2 weeks, the tile progress is showing strong. They laid out our floor tile on Friday, and told us that with mosaic they let it sit for a few days prior to gluing it into place to let the backing stretch out.

It's glued in now though, and looks amazing. Grout will come later - we selected a light grey color that will complement the floor marble and show up great against the white ceramic subway wall tiles.


The floor tile is so satisfying - so beautiful and clean. I can't wait to see the grout between the tiles, making the floor one solid piece rather than the hundreds of small pieces it is now. 


Needless to say, it looks great with our newly installed bath vanity. I can only imagine how much more it will all come together with a nice marble slab on top.


And that's not all! They made some good headway on our wall tile around the shower as well. The two rectangles you see are alcoves for keeping soap, shampoo, etc. They will be tiled in with the wall, all out of ceramic subway tiles like the ones you see.


So, we're thrilled with the progress. In the meantime we're in the process of moving out of the main floor of the house, getting ready for our hardwood floors to be refinished on Monday. I scheduled piano movers to get our piano to the garage, and we've begun adding more piles to our already growing storage space/guest rooms.

Here are some candid shots of our house in the midst of construction. We've changed our guest rooms into storage for kitchen things as well as things we could do without on our main floor - rugs, curtains, decorative accents, etc. The long and short of it is . . . we're a mess. And with hardwoods coming up next week, it's only getting worse. 
So here it is. This is our third bedroom, stuffed full of storage as well as boxes of tile near the doorway.


And our middle bedroom, also a guest room. Or, it used to be. Can you find the bed in this picture? This is also where Nino, our kitten, stays during the day to make sure he stays out of the way of workers as they come and go. 


And, this is where we've been eating lately. We have our fridge, trash and table full of cereal hanging out in the dining room. Is it surprising to you at all that we've been eating out a lot? And see the shop vac box sitting out? It's just waiting to be packed full of stuff so we can move it all out for hardwood refinishing on Monday.


Thursday, October 13, 2011

We Have Cabinets!

Well, I think I can pretty honestly say I accomplished nothing at work today, unless you count obsessing over the cabinets being installed at home. Needless to day, I sprinted out the door at 4:00 when I couldn't wait another minute, and came home to this stunning scene.



Again, still phone photos, sorry. I found the camera but the battery is dead, and this just cannot wait, right? Above is the view from the living room, and next is the view from the back door. There are still a few doors to install, and crown as well, so they'll come back next week to wrap it all up.


I'm so happy we went for inset doors - it creates such a clean, classic look. 


Glass still needs to be installed in the upper doors, but you can get the idea of the look without it. I love the clean white uppers, and look forward to arranging everything inside. 


We did just a few upgrades, including this spice rack next to the stove:


And this trash drawer next to the sink, with space for both trash and recycling. 


And finally, the show-stealer! Something about this little bathroom vanity just amazes me. It's so perfectly tucked in to our space, and the shallower depth makes for a very cute, streamlined petite look.


I couldn't be happier with how it all turned out. It shapes the space up so well, and we can really feel the layout of the rooms. The boxes and doors are perfectly smoothly finished, and feel solid and strong. 

Sneak Peek

For anyone who didn't catch the hint I left yesterday, get excited because cabinets are being installed in the house right now! This feels huge - this is really the big step we've been anxiously waiting for the most (other than the project being finished, of course).

Here are a few photos I snapped over lunch as the installers were working - forgive the poor quality. I was too excited to look for the camera so they're just phone pictures.



They seem to be off to a great start. They hope to finish installation today, or it could be tomorrow at the latest. I'll post more photos once everything is in.

Can you believe it? Cabinets!

Wednesday, October 12, 2011

Baby Steps

Bathroom tiling has begun! It's been mostly prep work so far because we're still waiting on floor tile to arrive, but they began tiling the walls above the bathtub, and wow! We couldn't be happier. I love the transition from the pretty white tub to the clean white tile on the walls. It's just a hint of what we're working toward, but we love the look so far. I've looked at so many hundreds of subway tile bathrooms over the past two years that this feels pretty surreal. I honestly have to remind myself that this is ours, and that our dream bath is finally underway.


We've had the the tile installers keep nice, tight joints between each tile so the grout lines will be minimal. We're going to have them do very light grey grout, so it actually won't look too different in color than the gaps do now - just a bit lighter.


Once the floor tile does arrive (come on, Home Depot!) it sounds like progress should move pretty quickly. Our bathroom is pretty small, and while we're using tile a ton (on the floor and walls, all the way to the ceiling around the tub, and 4 feet everywhere else) it still isn't a huge amount of surface area. We hope to be using this bathroom for showering (and bathing - YAY!) in the next week or so, which will be a tremendous relief as our creepy basement shower leaves much to be desired.

We're scheduled for a BIG delivery tomorrow. I won't tell you what it is, but this post should give a pretty unmissable hint.

Monday, October 10, 2011

Waiting . . . .


Today is (hopefully) the first day of tile installation, and also happens to be a very slow day at work. As a result I'm feeling incredibly impatient. I'm constantly checking the clock, waiting for it to be time to go home and check out the progress. 2:23 pm has never felt so much like 6:00 pm.

I have a feeling that I might be feeling this quite a bit this week, and the next few to follow, but that's only because big things are about to happen. In addition to tile, we expect cabinet installation to happen this week. Then templates for our countertop will be made October 17, with the counters installed on Halloween!

Good things come to those who . . . . wait . . . . . .

Thursday, October 6, 2011

Done and Done!


Our hardwood floors are finished! Can you believe it? 1.5 days of work, and bam - this is our kitchen floor. (Wrigley and Nino just can't stay away).


And don't forget our half bathroom floor (ignore the mud - why should I mop when they're going to sand anyway?): 


It's amazing to me how they've made smooth transitions everywhere from old to new floor, like here in the dining room doorway:

                          

So, we're moving on to the next big thing. And next up to bat is . . . .

 
bathroom wall tile! I can't tell you how happy I was to come home to find some concrete board hanging out on the porch, and lucky 13 boxes of white ceramic subway tile like the one above sitting outside the bathroom door. 

Seeing pieces of the finished product, like the floor and soon the tiles, is oh-so-satisfying! It reminds me of why we're living in a dusty pigsty with no furniture for several weeks, and why we've been saving and living in leaky, creaky ugly rooms for so long. Each of these things is a piece of the final vision, and we couldn't be happier to see them fall into place. 

Speaking of pieces of the final vision, my prints for the half bath arrived today, and I think they're even cuter in person than I expected! Now they just have to stand up to Chris' print quality test - but I have a feeling they'll fare well. 

Wednesday, October 5, 2011

Solid Ground


This week I learned that sheetrocking is boring. Fortunately it's finally finished, and we're moving on to the next thing which is much less boring . . . (drum roll please) . . . hardwood floor installation! This is much more tangible progress, and considering that over the past two years I've walked barefoot outside about 1,000x more than I've walked barefoot on the kitchen floor - it's a huge, long-awaited improvement.

I came home over lunch to find the sheetrock guy wrapping up (yay!), a big pile of unfinished oak floorboards stacked in our kitchen and two guys looking thoughtfully around our subfloor. When I came home at the end of the day I saw this:


They're lacing the new floorboards into our existing ones to create a seamless look, so that only we (and all of you) will know which ones are 85 years old and which ones are brand new. The last week of the renovation the entire first floor will be refinished, completing our ruse.


At this point I'd say installation appears to be about 1/3 complete, so hopefully we'll have all the new floors in by the end of the week. Already I feel a huge difference walking on what's been installed. It's totally solid - no creaks, no soft spots. I can't wait to see it all in.