Thursday, October 6, 2011

Done and Done!


Our hardwood floors are finished! Can you believe it? 1.5 days of work, and bam - this is our kitchen floor. (Wrigley and Nino just can't stay away).


And don't forget our half bathroom floor (ignore the mud - why should I mop when they're going to sand anyway?): 


It's amazing to me how they've made smooth transitions everywhere from old to new floor, like here in the dining room doorway:

                          

So, we're moving on to the next big thing. And next up to bat is . . . .

 
bathroom wall tile! I can't tell you how happy I was to come home to find some concrete board hanging out on the porch, and lucky 13 boxes of white ceramic subway tile like the one above sitting outside the bathroom door. 

Seeing pieces of the finished product, like the floor and soon the tiles, is oh-so-satisfying! It reminds me of why we're living in a dusty pigsty with no furniture for several weeks, and why we've been saving and living in leaky, creaky ugly rooms for so long. Each of these things is a piece of the final vision, and we couldn't be happier to see them fall into place. 

Speaking of pieces of the final vision, my prints for the half bath arrived today, and I think they're even cuter in person than I expected! Now they just have to stand up to Chris' print quality test - but I have a feeling they'll fare well. 

Wednesday, October 5, 2011

Solid Ground


This week I learned that sheetrocking is boring. Fortunately it's finally finished, and we're moving on to the next thing which is much less boring . . . (drum roll please) . . . hardwood floor installation! This is much more tangible progress, and considering that over the past two years I've walked barefoot outside about 1,000x more than I've walked barefoot on the kitchen floor - it's a huge, long-awaited improvement.

I came home over lunch to find the sheetrock guy wrapping up (yay!), a big pile of unfinished oak floorboards stacked in our kitchen and two guys looking thoughtfully around our subfloor. When I came home at the end of the day I saw this:


They're lacing the new floorboards into our existing ones to create a seamless look, so that only we (and all of you) will know which ones are 85 years old and which ones are brand new. The last week of the renovation the entire first floor will be refinished, completing our ruse.


At this point I'd say installation appears to be about 1/3 complete, so hopefully we'll have all the new floors in by the end of the week. Already I feel a huge difference walking on what's been installed. It's totally solid - no creaks, no soft spots. I can't wait to see it all in.

Monday, October 3, 2011

Deck the Walls



I took a bit of a blogging break last week, not due to any lack of progress but simply because it was progress that's just not blog-worthy.  It was drywall mudding. Very important and fun to see in person, but not so photogenic. Today should (hopefully) be the last day of drywall work, and then it's hardwoods and bathroom tile for the rest of the week. Yay!

In the meantime, Chris showed you how we spent our weekend, and I've done a bit of shopping today. During this year's Plaza Art Fair, we met local artist Angie Pickman from Lawrence (where Chris and I met at KU), who makes beautiful wall art out of cut paper. We instantly fell in love with the bold lines and whimsical themes of her work, and decided it was just what we need on the walls in our little "toilette" half bath.





While her cut paper originals are a bit out of our price range (and understandably so - she hand cuts each detail!), she sells high quality prints and greeting cards of the originals for very reasonable prices on Etsy, so we decided this was the way for us to go. I ordered an 8x10 of the top print, as well as these four cards. Once everything arrives we'll play with different arrangements to see what looks best in our little room, and any of the cards I don't hang on the wall will be great to use as, well, cards!

Climbing the Ladder

We're almost done sanding the huge back wall of shingles at our house. Once this wall is done, we're hoping the rest will feel a lot easier. Needless to say, this project was harder than we anticipated, but we think that the work will all be worth it in the end. Jay and Alex pitched yesterday to help us speed up progress. Results below.





Wednesday, September 28, 2011

All Walled In


When I left the house this morning it was all studs and insulation. Today when I came home all the drywall had been installed. What a change! It's amazing to see everything really take shape.

New den wall.

 Looking into the half bath from the den.
Looking into the kitchen from the living room.

Kitchen from the back door.

Wrigley cheesin' in front of the closet and dining room doorways.

Bathroom from the hallway.

New bathroom window, installed just this morning.

Bathroom vanity wall.

Tuesday, September 27, 2011

Drywall Begins

Today I was greeted by a large truck during lunch. Two guys brought in the longest strips of drywall I've ever seen. I walked upstairs to see our contractor taking measurements in the bathroom. He said that he's going to speed up bathroom production while the kitchen cabinets are made, so we may have a finished bathroom before a finished kitchen. This is good news for everyone in the house - walking two flights of stairs at 2:00 in the morning is just plain dangerous.


Back to the drywall. What's great about using a contractor is not having to worry about quantities of building materials required to complete the project. You deal with one guy, and he takes care of quantities, and deals with anyone taking care of tasks on the job site. By the end of the week we should have all of the drywall hung, taped and sanded to a smooth finish.


While this finish won't exactly match the rest of the house, we feel like the texture of the new walls will be a great look. 


In other news, we finally received a wall mount sink that will work great in our half bath. The third time was the charm on this one - right depth and right space. Can't wait to see this baby go up - she's going to be cute.


Finally, for work tomorrow I get to build a brick patio for a women's shelter here in Kansas City. A coworker saw our garden on the blog and "volunteered" me to lead this charge. Becca was gracious enough to join me this evening to get all the materials set up for the job site. As you can see, she laid out a beautiful flagstone path that will also be installed tomorrow. 


Can't wait to see walls begin to go up tomorrow. And that's not all. Hardwood floors come in next week. The show must go on!

Monday, September 26, 2011

Big Changes and a (Good) Surprise

Happy Monday everyone. The crew put in a full day today to make sure that everything's ready for sheetrock installation to begin tomorrow, and it really shows. Before I walked in the front door today I walked around the side of the house to this beautiful sight.


The first of our two new Pella windows has been installed, and we couldn't be happier with how it looks. The muntins you see in the top half will be stained dark when kitchen trim is stained, so it's not totally complete but it's close. The bathroom one will be installed very soon as well.

And that's not all. Our island has finally arrived! We ordered it six weeks ago and shipping was repeatedly delayed, but I picked it up Saturday, and Chris and I promptly put it in the middle of our gutted kitchen and had a celebratory beer on its walnut top. We absolutely love it, and seeing something finished in our very unfinished kitchen was pretty surreal.


The walnut grain on top is beautiful, and will provide a very practical surface that we can use and abuse. This was something we decided was important when we opted for marble counters rather than granite. They are slightly softer and less durable (but oh-so-beautiful and perfect for a classic kitchen look) so the island should make up for any loss in fuctionality. 


I picked up these cute little saddle stools to go with it. They're very comfy and fit nicely under the petite island. The whole setup is currently in our dining room, which is actually nice since we've cleared out the table and chairs.


The crew also got everything all insulated today to get us ready for drywall. The walls were previously empty between the studs, so we hope insulating these two rooms will help our house be a bit less drafty and a lot more efficient. It's strange how filling in the spaces between the studs creates a slightly wall-like effect. Our interior designer friend warned us that when the drywall goes up the room will suddenly feel a lot smaller, and I can see how that would be the case. 


And now for the surprise. Chris was talking to the contractor this morning who informed us that included in the remodel is installation of a ventilation system, which goes into the basement and vents out the wall. To be honest I'm not entirely sure what it does, other than he told us it will make our dehumidifier, which runs constantly in our basement unnecessary. I like the sound of that!


And I like a good surprise - we've had a couple of plumbing snafus during the project - all of which have been fixed, but they're still stressful as they happen. The first was a leak in our basement ceiling last week, which was apparently the result of a poorly connected pipe (big shock there, right?) that had been shifted when the kitchen was replumbed. The plumber fixed it promptly the next day. Then this weekend I ran the washer and our basement sink backed up. We tried to snake out the line ourselves but couldn't. He fixed it today, and I haven't had a chance to talk to him to get the recap. All in all though, he's our hero and has taken everything in great stride, and we know that moving forward our once condemable plumbing is in great shape.

Chris has repeatedly expressed his urge to kiss the plumber. I haven't warned him yet.

And finally, for all of you who are dying of "did the valve arrive" suspense, rest assured we have two valves, installed and ready for faucet trim. Yay for UPS!


That's it for today. Check in tomorrow to see walls start to go up. Crazy!