Showing posts with label marble. Show all posts
Showing posts with label marble. Show all posts

Thursday, March 27, 2014

Fireplace Oak Mantel and Marble Tile Remodel - Before & After



We started working on the mantel remodel in December after Ivy was born. Since then we've been busy with raising a newborn and everything that comes with that. 

On the weekends, I've been slowly chipping away the tiling portion of this job. Admittedly, the project took longer than I'd like, but I took my time getting everything updated since I'd never tiled before.

We started with refinishing the hearth. The old bricks tiles popped out fairly easily and I didn't have to cut too much tile for the job. I also spent a lot of time preparing the different brick surfaces for tile by coating them in thin set, which was a lot like floating joint compound.

Photos below document my progress from mantel pre and post tile.

Finished mantel before we tiled. Looks pretty good, probably could have stopped here if we had to.

Hearth was step one. You can see I dry fitted everything before laying the tile. The bricks are white from thin set.

The top row was a skinny long cut, so I just had Lowe's make a bunch of these tiles to save me the work.

This Old House recommended starting the vertical tiles across the top, with a ledger strip to guide the tiles across.

Pulled off the ledger guide and ready for the verticals strips.

I taped together my sections so the tiles stayed together.

Labeling helps keep things in order (A,B,C)

Tiles glued to wall, after grout.

Detail of finished job.

I repainted the cavity black - it has this empty clean feel now. 

Becca found the perfect side table and bird to complete the design.

Viola! Job is done - 4 months later - yikes. What do you think?

Monday, December 30, 2013

Our Fireplace Mantel Remodel

With three weeks off this Christmas break, I decided to update our mantel with some additional woodwork. We've been meaning to tackle this for a while, and a cold winter break served as the perfect motivation to get started.
This is what our fireplace looked like originally. Lots of brick, not much visual interest or style in my opinion.

Here was my initial idea for the design and future tilework.


A little more design tweaks with regards to trimwork and future fire source. Planning on red oak to match the top part, and stain it all chocolatey brown.


Notching inside face of wood to make room for bricks at bottom of fireplace. The bricks stuck out 1/2'' at the bottom, and I'd rather notch the wood than grind the brick.

Chisel knocks out the wood.

Sanded smooth, and fits.

Placed them over the bricks to confirm fit. I was able to find some nice 1 x 10" red oak that had an interesting grain pattern for the dominant leg/column pieces.

Wood on sides of fireplace needed special fitting to work around baseboards. I used a trim profile tool to trace the profile, and a jigsaw to cut it out. This was a pain in the butt, but working around existing trimwork is a skill I'm having to learn as a remodeler. I think getting a multi-tool would make my life easier.

Adding cross piece and more test fitting. I used tongue and groove joinery to make the pieces fit together.

Panel boards added for final test. Plus Jeopardy.

Stain added, pretty happy with overall look.

Next up, tile work.


Monday, October 17, 2011

Charmed by Tile

When I left the house this morning, Our contractor, two tile installers and a stone countertop templater (not a word, but you get the drift) were all there working hard. While we won't see the effects of countertop guy's work for 2 weeks, the tile progress is showing strong. They laid out our floor tile on Friday, and told us that with mosaic they let it sit for a few days prior to gluing it into place to let the backing stretch out.

It's glued in now though, and looks amazing. Grout will come later - we selected a light grey color that will complement the floor marble and show up great against the white ceramic subway wall tiles.


The floor tile is so satisfying - so beautiful and clean. I can't wait to see the grout between the tiles, making the floor one solid piece rather than the hundreds of small pieces it is now. 


Needless to say, it looks great with our newly installed bath vanity. I can only imagine how much more it will all come together with a nice marble slab on top.


And that's not all! They made some good headway on our wall tile around the shower as well. The two rectangles you see are alcoves for keeping soap, shampoo, etc. They will be tiled in with the wall, all out of ceramic subway tiles like the ones you see.


So, we're thrilled with the progress. In the meantime we're in the process of moving out of the main floor of the house, getting ready for our hardwood floors to be refinished on Monday. I scheduled piano movers to get our piano to the garage, and we've begun adding more piles to our already growing storage space/guest rooms.

Here are some candid shots of our house in the midst of construction. We've changed our guest rooms into storage for kitchen things as well as things we could do without on our main floor - rugs, curtains, decorative accents, etc. The long and short of it is . . . we're a mess. And with hardwoods coming up next week, it's only getting worse. 
So here it is. This is our third bedroom, stuffed full of storage as well as boxes of tile near the doorway.


And our middle bedroom, also a guest room. Or, it used to be. Can you find the bed in this picture? This is also where Nino, our kitten, stays during the day to make sure he stays out of the way of workers as they come and go. 


And, this is where we've been eating lately. We have our fridge, trash and table full of cereal hanging out in the dining room. Is it surprising to you at all that we've been eating out a lot? And see the shop vac box sitting out? It's just waiting to be packed full of stuff so we can move it all out for hardwood refinishing on Monday.


twitter test